Journal of Clinical Studies & Medical Case Reports Category: Medical Type: Original Research

Biostatistical Analysis on Bionical Intelligent RGV

Jinming Cao1, Bin Zhao2* and Mingzhe E2
1 School of information and mathematics, Yangtze University, Jingzhou, Hubei, China
2 School of science, Hubei University of Technology, Wuhan, Hubei, China

*Corresponding Author(s):
Bin Zhao
School Of Science, Hubei University Of Technology, Wuhan, Hubei, China
Tel:+ 86 130 2851 7572,
Email:zhaobin835@nwsuaf.edu.cn

Received Date: Mar 13, 2020
Accepted Date: Mar 16, 2020
Published Date: Mar 23, 2020

Abstract

This paper studies the dynamic scheduling problem of bionical intelligent RGV, Modeling and Simulation of RGV scheduling problem in 4 cases of bionical intelligent machining system, and the simulation results of the model are tested by using three sets of real working data of RGV. Under known conditions, according to the working condition of a process, the RGV scheduling path is taken as the decision variable, and as much as possible clinker is processed as the objective function. Based on the idea of 0-1 planning, the RGV dynamic scheduling model is established when a process does not occur. Then a heuristic algorithm is constructed for the modeled model, Through simulation, the total production of materials under three sets of parameters is 383, 358, 392, and the system operation efficiency is not less than 98%. For the random failure of the processing system, the random failure probability is increased to 1% on the existing model, and the manual troubleshooting is performed. The duration is subject to the uniform distribution of 10~20 minutes, and the RGV dynamic scheduling model for single and double process machining under the condition of CNC probability failure is established. The total production of materials under one process is 357, 336, 362 respectively. The efficiency is as high as 98.3%, 95.9% and 98.4%; the total production of materials under the two processes is 223, 336, 362 respectively. Industry efficiency were 95.7%, 96.7% and 96.2%. Data simulation results show that the dynamic scheduling model for the establishment of RGV and practical algorithm.

Keywords

Bionical intelligent RGV; Multi-objective optimization; Optimal scheduling; Simulation; 0-1 planning

INTRODUCTION

The RGV is an bionical intelligent vehicle that can run freely on a fixed track. The material processing system of RGV can save huge labor costs for factories such as manufacturing factories and logistics centers. Figure 1 gives an example of this guided-vehicle system [1]. Unlike the classical material processing system, many bionical intelligent RGVs in modern processing systems no longer use fixed path, bionical intelligent R. The scheduling scheme of GV is realized by programming [2,3]. Literature [4] presents several algorithms for solving dynamic PDPTW model. RGV scheduling problem is one of the most important issues in material processing system [5,6]. The performance of material processing system has a decisive impact on the efficiency of the whole equipment [7]. In the design of scheduling path, the most common performance criterion is to minimize the total distance of RGV under given system parameters [8,9]. Due to the different working environments, there is still no ideal algorithm to optimize the RGV scheduling path. Therefore, there is still a lot of research space for the dynamic scheduling of RGV in the specific system working environment.

Figure 1:  Guided-vehicle system schematic. 

The remainder of this paper is organized as follows. Section 2 describes the recent state-of-the-art in bionical intelligent vehicle’s parameters. We discussion the condition of the problems in the study we may meet in section 3. Section 4 is the hypothesis we assumed in the study. And the section 5 is the symbol description. Section 6 describes in detail the proposed dynamic programming model based on 0-1planning. Section 7 tested the proposed method using actual data. Finally, section 8 concludes this study, outlining its contributions and possible directions for future work.

RELATED WORK

System operation parameters 

The working environment studied in this paper consists of 8 CNCs, 1 RGVs, 1 RGV linear track, 1 feeding conveyor, 1 feeding conveyor and other equipment. Figure 2 shows the schematic diagram of this material processing system. 

Figure 2:   Intelligent processing system schematic. 

The operating parameters of this material processing system are derived from the latest available literature [10-13]. 

System operation parameters

Group 1

Group
2

Group
3

The time required for RGV to move one unit

20

23

18

The time required for RGV to move two unit

33

41

32

The time required for RGV to move three unit

46

59

46

The time required for CNC to process materials for one process

560

580

545

The time required for CNC to complete the first process of two-process material

400

280

455

The time required for CNC to complete the second process of a two-process material

378

500

182

RGV is the time required for CNC #1, #3, #5, #7 to load and unload at one time

28

30

27

RGV is the time required for CNC #2, #4, #6, #8 to load and at one time unload

31

35

32

RGV takes time to complete a material cleaning operation

25

30

25

Table 1:  3 sets of data sheets for intelligent processing system operating parameters.

Three specific cases 

• The material processing operation of one process, the same tool is installed for each CNC, and the material can be processed on any CNC
• In the process of material processing in two processes, the first and second processes of each material are processed by two different CNCs in sequence
• The CNC may malfunction during the machining process (the probability of failure is about 1%). It takes 10 to 20 minutes for each manual failure (unfinished material scrap) [12-14]. After the troubleshooting, the CNC immediately joins the sequence. Require separate consideration of material processing operations for one process and two processes 

Research task 

• We study the three working conditions and give the dynamic scheduling model of RGV
• The model is tested by using three sets of data of the system operating parameters in Table 1, and the scheduling strategy of RGV and the operating efficiency of the system are given

PROBLEM ANALYSIS

This paper studies the dynamic scheduling problem of RGV in intelligent processing system. According to the working requirements of RGV, under the actual operating rules of intelligent system, three general problems are considered: material processing operation in one process, material processing operation in two processes, and CNC failure. In the case of a process and two processes of material processing operations. The RGV dynamic scheduling model is established, and the corresponding algorithm is given. The practicality of the model and the effectiveness of the algorithm are tested by using the three sets of system operating parameter data respectively. The scheduling strategy of RGV and the operating efficiency of the system are given.

Analysis of task (1) 

For the case (1): In the working process of the intelligent processing system, RGV can only load and unload one CNC at a time. The relationship between RGV and 8 CNCs per round can be expressed by 0-1 logic variable. The maximum amount of material obtained is taken as the objective function. The processing rule in the intelligent processing system is used as the constraint condition. Based on the 0-1 planning idea, the RGV dynamic scheduling model under a process processing demand is obtained. Construct a heuristic algorithm and solve the model through simulation [15]. 

For the case (2): This paper considers that the maximum amount of RGV work is the largest as the objective function, and the constraint condition corresponding to the new machining rule is added to the original constraint to establish a double target based on the maximum number of materials obtained. The planned RGV dynamic programming model under the two process processing requirements, and gives a concrete feasible solution algorithm. 

For the case (3): When the CNC has a 1% probability of failure, the repair time of the faulty CNC can be regarded as a long processing time, and the time for manual troubleshooting is uniformly distributed within 10 to 20 minutes. After the fault is removed, the CNC restarts. At this time, the waste material has been removed, and the CNC immediately issued a demand instruction. These work rules are embedded into the established dynamic scheduling model to obtain the RGV dynamic programming model under the condition of CNC probability failure, and the model is solved by simulation. 

The dynamic programming model is one of the optimization methods in solving the dynamic scheduling problem [16,17]. The problem it deals with is a multi-stage decision problem, which starts from the initial state and reaches the end state by selecting the intermediate stage decision [18,19]. These decisions form a sequence of decisions and define an activity path (usually the optimal route of activity [20]) that completes the entire process. 

Initial state → ? decision 1 ? → ? decision 2 ? → .. → ? decision n ? → end state 

The design of dynamic programming has a certain pattern, generally going through the following steps: 

• Division stage: According to the time or space characteristics of the problem, the problem is divided into several stages. These stages must be ordered or orderable (ie, no backwardness), otherwise the method fails
• Determining state and state variables: The various objective situations in which problems are developed into phases are represented in different states. Of course, the choice of state should be met without inefficiency. From the perspective of graph theory, if the state in this problem is defined as a vertex in the graph, the transition between the two states is defined as the edge, and the weight increment in the transfer process is defined as the weight of the edge, then the composition A directed acyclic weighted graph, therefore, this graph can be "topologically ordered [21], at least in the order of their topological ordering
• Determine the decision and write the state transition equation: Because decision and state transition have a natural connection, state transition is based on the state and decision of the previous phase to derive the state of this phase. So if the decision is determined, the state transition equation can be written. But in fact, it is often done in reverse, determining the decision based on the relationship between the states of the two adjacent segments. The sequence of decisions made at each stage is called a strategy
• Finding Boundary Conditions: The given state transition equation is a recursive equation that requires a recursive termination condition or boundary condition. The main difficulty of dynamic programming lies in the theoretical design. It is true that the role of dynamic programming is very large 

Analysis of task (2) 

For task (2): use three sets of system operation parameters to test the solution results, define WCNC (the working efficiency of the CNC), and use this index to measure the practicability of the scheduling model.

PROBLEM HYPOTHESIS

In order to reduce the complexity of the problem and simplify the establishment and solution of the model, this paper makes the following assumptions before establishing the model 

• It is assumed that the CNC machining time is constant and consistent for a certain process determined [22]
• It is assumed that the RGV will not load or unload the RGV until it moves to the CNC position after receiving the loading request from the CNC [23]
• It is assumed that the probability of failure occurs during the processing of one process material and the processing of materials in each step of the two processes is regarded as 1%
• Due to safety requirements, the tool cannot be replaced in the middle until the system stops working after the system is started
• Unless the system stops working for 8 hours of continuous operation, the RGV's movement, loading and unloading, cleaning, etc. will not be stopped midway [24]

SYMBOL DESCRIPTION

 

Symbol

Description

unit

k

Number of loadings in the processing system

time

t1

RGV’s loading and unloading time in one cycle

s

t2

RGV’s cleaning time in one cycle

s

t3

RGV’s movement time in one cycle

s

Ci

material within 8 hours

time

fi (k )

The status of the material on the first CNC
before loading in the k-th round

 

T (k )

The maintenance time of the i-th CNC at the s
time of the k-th loading

 

WCNC

Intelligent processing system's working
efficiency within 8 hours

s

 Note: Other symbols are specified in the text.

MODEL ESTABLISHMENT

In the intelligent processing system, RGV can compare the remaining machining time of 8 CNCs, the loading and unloading time, and the time required for RGV to move to the corresponding CNC position. This kind of RGV can judge the material order and advance to the next round of optimal CNC [25]. Departure, making the overall waiting time of 8 CNCs within 8 hours the least. In this paper, RGV is used as the object of dynamic scheduling, and the RGV dynamic scheduling model is established and solved. The optimal scheduling scheme of RGV under three specific working conditions is compared. 

The intelligent working system has a continuous working time of 8 hours, which makes 8 hours a complete processing process. The goal of dynamic scheduling is to minimize the total non-working time of the CNC within 8 hours. It is easy to know the total time of a complete machining process of the intelligent processing system is 

T = 8h = 28800s           (1)

During a complete machining process, the machining system is started, the RGV executes the command from the initial position, and the machining is stopped near the 28800s, at which time the RGV returns to the initial position. The RGV workflow is shown in Figure 3.

 Figure3:  RGV work flow chart.

 

Model establishment of case (1) 

For a processing system with only one process, the goal of the RGV dynamic scheduling model is to maximize the processing efficiency, that is, to process the material as much as possible within a given time, so that the number of processed materials is as large as possible. In the intelligent processing system, when one RGV is dispatched to load and unload 8 CNCs arranged on both sides, 

the k-th wheel of the RGV trolley can only go to and from the i-th CNC, and the 0-1 variable xi?k ? is introduced.

In equation (2), i ?1,2, , n and in this context, eight CNCs in the intelligent system are represented. When the material is in the processing state, the corresponding CNC must be in the working state; 

when the material is in the non-processing state, the CNC without the working state corresponds to it. Defining the RGV operation for each CNC and only operating once and finally returning to the starting position is a cycle. In the intelligent system, the RGV goes to the i-th CNC to complete the working cycle of the workingcycle in the k-th round t(k) can be expressed as

Where t1,i (k)  is the time when the CNC is loaded and unloaded once, t2,i (k)  is the time when the RGV completes the material cleaning, and is the time when the RGV moves. When the CNC's operating parameters are given, is known in the same operating system, so the relative size of the total time taken by the RGV to go to the i-th CNC to complete a working cycle when the RG is loaded in the k-th wheel is only determined. Through the above analysis, the objective function of the RGV scheduling model in one process is as follows

Where Ci  is the number of materials processed by the first CNC within 8 hours of a complete working process. 

Before the processing system is loaded, the CNC used is divided into two types: processed material and unprocessed material.

Where fi (k)   is the material status on the first CNC before the k-th wheel is loaded. When the processing system is working, RGV can only work on one CNC at a time, loading and unloading, and the constraints on the decision variable xi (k)    in the scheduling model are as follows.

Within 8 hours of a complete machining process, the greater the total working length of 8 CNCs, the higher the efficiency of the processing system. We geti is the CNC number in the system, and (7)

Where k denotes the first loading of the processing systemmeans that the total working length of 8 CNCs does not exceed 28800s during a complete machining process.

After the processing system is turned on, the total working time of 8 CNCs is 0 before the first round of loading. Which is

In summary, after the simultaneous objective function and constraints, the RGV dynamic  scheduling model with the largest total working time of 8 CNCs in 8h is established as follows

Model establishment of case (2) 

For the work with two processes, the first process and the second process of each material must be processed by two different CNC processes. For the entire two-step process, when a CNC completes the second process, the CNC is in a wait state and sends a demand signal to the RGV. When the RGV moves to the front of the CNC, the following steps are continuously performed:

Loading and unloading: remove the clinker from this CNC; when the last time RGV was done in the process, put a new semi-clinker into the CNC; when the last time RGV was done in the second step, the CNC did not put it in the CNC. Enter any material. Cleaning operation: The clinker taken out is cleaned. At this time, the position of RGV is unchanged in the orbit. RGV finds the next CNC to work according to the order of the demand signal and the distance of the distance. Repeat the above steps of “loading and unloading” and “cleaning operation” until the end of 8 hours.

When the process requires two processes, the material process status factor X ( k ) and the CNC process type factor Yi are introduced. When the two factors match successfully, the RGV can continue to load and unload. At this time, there are 256 kinds of tool distribution schemes for 8 CNCs in the intelligent processing system. This paper establishes a dual-objective planning model for processing system RGV scheduling within 8 hours. 

Based on the case (1) The objective function formula (4) with the largest number of production materials within 8 hours has been established, and the objective function is increased as follows

Among them, the working parameters of the working system such as the length of one loading and unloading t1,(ki ) and the length of one material cleaning t2,(k are given by Table 1. For the work case with two processes, in addition to the constraints (6)-(8), it is necessary to add and increase the constraints as follows

Where equation (11) indicates that in a machining shift, a CNC can only process a specified process with one type of tool installed.

Where equation (12) represents the two states of the material to be processed. When loading in the k-th round, only when the material is successfully paired with the CNC can be loaded, which is

In summary, in the case of two processes, the dual-objective planning model for RGV dynamic scheduling is as follows

Model establishment of case (3) 

For the case of random failure in the intelligent processing system, the situation (3) has pointed out that the probability of failure is about 1%, and it takes 10 to 20 minutes to manually process the failure. After the troubleshooting, the CNC immediately joins the operation sequence. The RGV dynamic scheduling model with random faults is established. On only one process and the existing model with two processes, the constraints are added, so that the improved scheduling model can collect fault information and update the RGV work instructions. 

During the working process of the processing system, the probability of a CNC failure is determined, that is

Among them, it indicates that the i-th CNC has failed during the loading in the k-th round. After a failure, the manual repair time is 10 to 20 minutes, that is

Among them, Trepair,i (k) is the maintenance time after the failure of the i-th CNC in the k-th wheel loading. When S(k) occurs, the i-th CNC at the time of loading in the k-th round cannot work normally according to the original setting, that is

At this point, manual repair is required to remove the waste, which is

In summary, the constraints (15)-(18) on the random failure in the processing system are added to the scheduling model (9) of a process, and the RGV scheduling model for one process and random failure is as follows

Adding the constraints (15)-(18) on the random faults in the processing system to the scheduling model (14) of the two processes, the RGV scheduling model with two processes and random failures is as follows

MODEL SOLUTION

The above-mentioned planning problems involve as many as tens of thousands of decision-making variables, and it is impossible to use traditional planning methods for computer solving. For the k-round machining process of 8 CNCs in RGV bionical intelligent processing system, the optima candidate CNC is selected in real time, which involves the calculation of O (N !). It is an NP problem, that is, the non-deterministic problem of polynomial complexity. Excellent solution, In this paper, a heuristic algorithm is constructed by each round of loading and unloading time, and the simulation problem model is used to solve such planning problems. Define WCNC (the system's work efficiency), which is used to measure the efficiency of the RGV scheduling model under different types of work.

Solution of the model in three cases

For the case where there is only one machining program and no failure, use MATLAB to simulate the planningmodel (9). The results based on the three sets of given operating parameters are shown in table 2. 

Objective
number

CNC

Parameter group 1

Parameter group 2

Parameter group 3

   

tup

tdown

tup

tdown

tup

tdown

1

1

0

588

0

629

0

572

2

2

53

644

60

689

52

629

3

3

129

721

148

778

127

705

4

4

182

774

208

838

179

757

5

5

258

851

296

927

254

833

358

6

26317

26908

28163

28795

25696

26273

383

7

28167

28758

   

27503

28080

392

8

       

28132

28709

Table 2: Scheduling strategy for case (1). 

In table 2, and are the loading start time and the blanking start time, respectively. It can be found that when there is only one machining program and no failure occurs, the CNC is used to present a working cycle of 1 → 2 →→ 7 → 8 The RGV scheduling process at this time is shown in figure 4.When RGV works in parameter group 1, 383 materials are processed in one complete working process, which lasts 28758s; when RGV works in parameter group 2, 358 materials are processed in one complete working process, which lasts 28795s; when RGV is parameter group 3 At work, a total of 392 materials were processed during a complete work, which lasted 28,709 s.

Figure 4: RGV Scheduling Diagram for case (1).

For the case of two machining programs without failure, use MATLAB to simulate the planning model (14). The results based on the three sets of given operating parameters are shown in table 3-5.

Objective number

Process one
CNC

ttup

tdown

Process two CNC

tup

tdown

1

1

0

428

2

456

884

2

4

48

507

3

538

991

3

6

99

586

5

617

1095

248

8

27777

28228

7

28259

28710

Table 3: Case (2) Scheduling strategy for parameter group 1.

It can be seen from table 3. that when the processing system with two processes works in parameter group 1, a maximum of 248 clinker can be produced in one complete work process, and CNCs numbered 1, 4, 6, and 8 are used in the first process. The CNC numbered 2, 3, 5, and 7 perform the second process on the material, and the total time is 28,710 s. The RGV scheduling process at this time is shown in figure 5.


Figure 5: Case (2) Scheduling strategy for parameter group 1. 

Objective number

Process one CNC

tup

tdown

Process two CNC

tup

tdown

1

1

0

310

2

340

985

2

4

53

398

3

433

1103

3

5

111

486

6

516

1221

195

1

27727

28135

8

28224

28945

Table 4: Case (2) Scheduling strategy for parameter group 2.

It can be seen from table 4 that when the processing system with two processes works in parameter group 2, a maximum of 195 clinker can be produced in one complete working process, and CNCs numbered 1, 4, and 5 are used in the first process. The CNC numbered 2, 3, 6, 7 and 8 perform the second process on the material, and the total time consumption is 28945s. The RGV scheduling process at this time is shown in Figure 6.

Figure 6: Case (2) Scheduling strategy for parameter group 2. 

Objective number

Process one CNC

ttup

tdown

Process two

tup

tdown

   

CNC

1

2

0

487

1

519

791

2

4

50

564

3

596

953

3

6

100

641

5

673

1175

             

227

2

27736

28347

5

28411

28818

Table 5: Case (2) Scheduling strategy for parameter group 3. 

It can be seen from table 5 that when the processing system with two processes works in parameter group 3, a maximum of 227 clinker can be produced in one complete working process, and CNCs numbered 2, 4, 6, 7 and 8 are used in the first process. The CNC numbered 1, 3, and 5 perform the second process on the material, and the total time consumption is 28818s. The RGV scheduling process at this time is shown in Figure 7. It is easy to know, and has two processes and does not occur. In the randomly faulty RGV working system, among the three sets of given operating parameters, parameter group 1 can be used to produce the most clinker.


Figure7: Case (2) Scheduling strategy for parameter group 3.

For the case of only one machining program and random failure, use MATLAB to simulate the planning model (19). The solution results based on the three sets of given operating parameters are shown in Table 6. 

Objective
number

CNC

Parameter group1

Parameter group 2

Parameter group 3

 

 

tup

tdown

tup

tdown

tup

tdown

1

1

0

635

0

670

0

619

2

2

53

688

60

730

52

671

3

3

129

764

148

818

127

746

4

4

182

817

208

878

179

798

5

5

258

893

296

966

254

873

 

 

 

 

 

 

 

 

336

2

26466

27088

28140

28810

26182

26801

 

 

 

 

 

 

 

 

357

1

28147

28785

 

 

27855

28474

 

 

 

 

 

 

 

 

362

7

 

 

 

 

28161

28780

Table 6 Scheduling strategy with one operation and random failure.

In table 6, when there are two machining programs and there is a random failure, the CNC also exhibits a working cycle of 1 → 2 →→7 → 8 . When RGV works in parameter group 1, a total of 357 complete materials are processed in one complete working process, and 336 clinker materials are processed in the whole working process. The random fault occurs once and lasts for 28810s. When RGV works in parameter group 3, once A total of 362 complete materials were processed during the complete work process, and random failures occurred 4 times for a total duration of 28,780 s. 

For the case of two machining programs with random faults, use MATLAB to simulate the planning model (20). The results based on the three sets of given operating parameters are shown in table 7-9. 

Objective number

Process one CNC

ttup

tdown

Process two CNC

tup

tdown

1

1

0

475

2

503

978

2

4

48

554

3

585

1085

3

6

99

633

5

664

1189

223

6

27647

28214

2

28278

28845

Table 7:  Scheduling strategy for parameter group 1 under two processes and random failures. 

It can be seen from Table 7 that when the processing system with two processes works in the parameter group 1, a maximum of 248 clinker can be produced in one complete working process, and the random failure occurs twice in each of the first and second steps, numbered 1 The CNC of 4, 6, and 8 perform the first process, and the remaining 4 CNCs perform the second process, with a total time of 28,845 s. 

Objective number

Process one CNC

ttup

tdown

Process two CNC

tup

tdown

1

1

0

352

2

382

1069

2

4

53

440

3

475

1187

3

5

111

528

6

558

1305

192

1

27545

27858

3

27911

28632

Table 8: Scheduling strategy for parameter group 2 under two processes and random failures.

It can be seen from Table 8 that when the processing system with two processes works in parameter group 2, up to 195 clinker can be produced in one complete work process, and random failure occurs once in process one, and does not appear in process two. The total time is 28945s. 

Objective number

Process one CNC

tup

tdown

Process two CNC

tup

tdown

1

2

0

534

1

566

838

2

4

50

611

3

643

1000

3

6

100

688

5

720

1222

228

7

27762

28401

5

28446

28766

Table 9: Scheduling strategy for parameter group 3 under two processes and random failures.

It can be seen from table 9 that when the processing system with two processes works in parameter group 3, up to 227 clinker can be produced in one complete work process, and random failures occur three times in process one and process two, respectively. It is 28818s. It is easy to know that for the RGV working system with two processes and random failure of 1%, among the three sets of given operating parameters, parameter group 3 can be used to produce the most clinker.

Work efficiency solution 

In an bionical intelligent system, RGV essentially provides services for the CNC, so that Tm is the total working time of a complete working process, n is the number of CNCs, t pi is the actual working time of the i-position CNC in the entire working hours, and defines the CNC. The work efficiency indicators are as follows

where in equation (21), WCNC is the ratio of the sum of the actual working hours of all CNCs to the total working time of all CNCs, and the larger WCNC , the higher the operating efficiency of the bionical intelligent system. In the design of RGV dynamic scheduling, when the number of produced materials is as much as the objective function, the CNC waiting time should be reduced as much as possible, and the actual working time should be increased to improve the overall working efficiency of the bionical intelligent system. Using equation (21), the working efficiency of the machining system under three working conditions of one process, two processes and random failure is shown in table 10 and table 11. 

No Random failure

Parameter group 1

Parameter group 2

Parameter group 3

 

One

Two

One

Two

One

Two

 
 

process

processes

process

processes

process

processes

Objective number

383

248

358

195

392

227

 

åt pi

226320

223856

226224

224105

226159

224271

nTm

230064

229680

230360

231560

229672

230544

WCNC

0.98373

0.97464

0.98205

0.96781

0.9847

0.97279

 Table 10: Work efficiency of situation (1) and situation (2). 

In Table 10 , Tm is the total working time of a complete working process, tpi is the number of CNCs, and WCNC is the actual working time of the CNC in the entire working time, which is obtained by equation (21). From Table 10, it can be seen that in a processing system with only one process and no random failure, RGV has the highest working efficiency when producing clinker according to the third group working parameters, and the processing system has two processes without random failure. Working with the first set of parameters is the most efficient. 

Random

Parameter group 1

Parameter group 2

Parameter group 1

Parameter group 2

Parameter group 1

Parameter group 2

 

One process

Two process

One process

Two process

One process

Two process

Objective number

357

223

336

192

362

228

 

åtpi

226290

221031

221100

221508

226559

221499

nTm

230280

230760

230480

229056

230240

230128

 

0.98267

0.95784

0.9593

0.96705

0.98401

0.9625

 Table 11: Working efficiency of one process and two processes under random failure. 

In Table 11, WCNC is also obtained by the formula (21). When the intelligent processing system has only one process but there is a random failure, RGV still produces the clinker according to the third group working parameters, and the working efficiency is the highest. When the processing system has two processes but a random failure occurs, the work of the second group of parameters is performed. The most efficient. When using the established RGV scheduling model to plan the work of the intelligent processing system, no matter which operating parameters the processing system works, the processing efficiency of the system will not be lower than 95%.

CONCLUSION

In this paper, the dynamic scheduling of 8 CNC machining systems is studied. The RGV scheduling scheme under different working conditions is given, and the working efficiency of the system is calculated. The simulation results show that the dynamic scheduling model and algorithm for bionical intelligent RGV are feasible. In actual production, when the number of CNCs in the processing system increases, genetic algorithm and ant colony algorithm can also be considered to calculate the tool distribution scheme, thereby improving the calculation efficiency.

CONFLICT OF INTEREST

We have no conflict of interests to disclose and the manuscript has been read and approved by all named authors.

ACKNOWLEDGEMENT

This work was supported by the Philosophical and Social Sciences Research Project of Hubei Education Department (19Y049), and the Staring Research Foundation for the Ph.D. of Hubei University of Technology (BSQD2019054), Hubei Province, China.

REFERENCES

  1. Le-Anh T, van der Meer J R (2004) Testing and classifying vehicle dispatching rules in three real-world settings. Journal of Operations Management 22: 369-386.
  2. Jünemann R, Schmidt T (2000) Materialflusssysteme: Systemtechnische Grundlagen[M]. Springer.
  3. Tompkins J A, White J A, Bozer Y A, et al. (2010) Facilities planning[M]. John Wiley & Sons.
  4. Savelsbergh MWP, Sol M (1995) The general pickup and delivery problem. Transportation science, 29: 17-29.
  5. Luo J, Wu C, Hong W, Cheng Y (2010) Research on Scheduling of the RGV System Based on QPSO. Page no: 1169-1174.
  6. Le-Anh T, De Koster MBM (2006) A review of design and control of automated guided vehicle systems. European Journal of Operational Research 171: 1-23.
  7. Beamon B M (1998) Performance, reliability, and performability of material handling systems. International Journal of Production Research 36: 377-393.
  8. Gaskins R J, Tanchoco J M A (1987) Flow path design for automated guided vehicle systems. International Journal of Production Research 25: 667-676.
  9. Kaspi M, Tanchoco JMA (1990) Optimal flow path design of unidirectional AGV systems. The International Journal of Production Research 28: 1023-1030.
  10. Pei X, Liu T, Lu S, et al. Study on Optimizing Dynamic Scheduling of Intelligent RGV[C]//3rd International Conference on Computer Engineering, Information Science & Application Technology (ICCIA 2019). Atlantis Press.
  11. Luo S (2019) RGV optimal scheduling scheme selection in multi-process scenario. AIP Publishing 2073: 020092.
  12. Yao Y (2019) Priority-based intelligent allocation scheduling model. AIP Publishing 2073: 020100.
  13. Jia Y (2019) Based on Intelligent RGV Dynamic Scheduling Model of Particle Swarm Optimization. IOP Publishing 252: 052135.
  14. Yin J Y, Chen N, Zhang Z T, Chen SS (2019) RGV Dynamic Scheduling Strategy Based on Network Cellular Automaton and Marko Model. IOP Publishing 569: 032026.
  15. Meersmans PJM (2002) Optimization of container handling systems. Public Performance & Management Review.
  16. Bellman R, Kalaba R E (1965) Dynamic programming and modern control theory. Academic Press New York, USA.
  17. Liu Q, Dong M, Lv W, Ye C (2019) Manufacturing system maintenance based on dynamic programming model with prognostics information. Journal of Intelligent Manufacturing 30: 1155-1173.
  18. Hubert L, Arabie P, Meulman J (2001) Combinatorial data analysis: Optimization by dynamic programming. SIAM.
  19. Bellman RE, Dreyfus SE (2016) Applied dynamic programming. Princeton university press, New Jersey, USA.
  20. Bertsekas D P (1995) Dynamic programming and optimal control. Athena scientific, Belmont, USA.
  21. Hansson T H, Oganesyan V, Sondhi S L (2004) Superconductors are topologically ordered. Annals of Physics 313: 497-538.
  22. Dai Y, Cao J (2019) Scheduler of CNC-RGV System based on STFF Model. Atlantis Press, USA.
  23. Yin P (2019) Study on Optimal Scheduling of RGV in Industrial Production. IOP Publishing 493: 012109.
  24. Li Y (2019) Scheduling analysis of intelligent machining system based on combined weights. IOP Publishing 493: 012146.
  25. Yang F, Zhang H, Guo X, et al. (2019) Dynamic Schedule Strategy of RGV Based on the Weighted Directed Graph.

Citation: Zhao B, Cao J, Mingzhe E (2020) Biostatistical Analysis on Bionical Intelligent RGV. J Clin Stud Med Case Rep 7: 084.

Copyright: © 2020  Jinming Cao, et al. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.


Herald Scholarly Open Access is a leading, internationally publishing house in the fields of Sciences. Our mission is to provide an access to knowledge globally.



© 2024, Copyrights Herald Scholarly Open Access. All Rights Reserved!